030 70016542
Send an enquiry

We design and build in existing buildings, in Berlin and Brandenburg. With our own project managers, architects, engineers and site managers, in one contract.

Send an enquiryHow we plan

Object
Tenement, Gründerzeit
View
Exterior
Levels
−2.60 to +20.40
Planner
CLIENI Bau, as of 10/2026

CLIENI Bau, general contractor in Berlin

What you get from us.

Six advantages, each backed by a rule we keep in every contract. Not promised, but agreed.

One team, in house.

Project managers, architects, engineers for every discipline and site managers: all at CLIENI Bau. You deal with one person, and everyone on the team knows what they answer for.

You

The client, with one contact

Project management

At the table. Our project manager is your contact, from the first meeting to the end of the warranty period. Every agreement runs through them, in writing.

Design

In the plan. Our architects and engineers, for every discipline.

  • Design and building application
  • Structure and structural analysis
  • Fire safety
  • Sound and thermal insulation under GEG
  • Building services and drainage

Site management

On site. Site management on site two to three times a week, daily for waterproofing, screed and penetrations. Our site managers keep the site diary with photos.

Management

In the contract. Contract, offer and prices are the responsibility of the management. Variations are approved there, not on site.

25 trades, one site management

From strip-out to acceptance our site management runs every trade: sequence, interfaces, inspections and acceptance.

Who does what, who is liable.

That is settled before the offer, not on site. Three models, one contract partner.

1contract on your desk

Design and build in one contract.

You describe what is to be built. Our architects design and obtain the permit, our engineers calculate the structure, our site management builds and hands over with an acceptance report.

In the contract
Design, permit, structural analysis, construction, acceptance and warranty.
Liability
One warranty address for design and construction. You never have to work out whether the designer or the builder made the mistake.
Suits
Loft conversions, layout changes with wall openings, conversions in conservation areas, additional storeys.

Enquire with this modelAbout the model

You do not need to know the model. Describe the project and we will name it. Describe your project

A century behind the plaster.

Berlin's Gründerzeit tenements have stood for more than a hundred years. What lies behind plaster, floorboards and pugging only shows once they are opened.

At the site visit we record what the building reveals: dimensions, moisture, pipe materials, beam ends, and for buildings from before 1995 any suspected hazardous materials. Whatever only becomes visible once opened is in the offer beforehand, as a provisional item with a unit price.

Plan first, then build.

Every project passes through the same six stations. Each ends with a document you keep.

The full process, step by step

  1. 1

    Enquiry

    The form with documents, or a phone call. Describe the project in three sentences and you get a first view on the right model on the phone.

    You receiveA proposed date for the site visit

    Reply with an appointment proposal within 48 hours on working days

  2. 2

    Site visit

    Survey of dimensions, moisture, pipe materials and suspected hazardous materials in buildings from before 1995.

    You receiveSurvey report with photos

    The on-site survey takes one to two hours, On-site survey free of charge and without obligation

  3. 3

    Offer

    Every item listed with its unit price. Foreseeable risks are in the offer as provisional items, so they do not catch you out.

    You receiveBill of quantities with unit prices and provisional items

    Fixed-price offer with unit prices and contingency items within five working days of the site visit

  4. 4

    Design and preparation

    Structural analysis and permit from our design team where needed. Materials, delivery times and inspections are lines of their own in the schedule.

    You receiveSchedule with sequence of trades and drying times

    before work starts

  5. 5

    Construction

    Your site manager runs the sequence and the interfaces. Variations only with your approval, before the work.

    You receiveSite diary, photos of concealed works, approvals in CLIENI Connect

    ongoing

  6. 6

    Acceptance

    Joint inspection, defects list with deadlines, handover of the documentation: measurements, pressure test reports, waterproofing photos, disposal records.

    You receiveAcceptance report, final invoice, one warranty address

    at handover

One flat, 21 weeks.

The schedule of a flat refurbishment. Every activity has its week, its inspection point and its document. The duration of your project is stated in the offer.

Week21of 21

Acceptance and handover

On site
Site management and client together.
Checked
Inspection of every room, defects list with deadlines, function test of all installations.
Document
Acceptance report under VOB/B § 12, final invoice, documentation with all reports and photos, one warranty address.

Guide values. Permit procedures and delivery times come before. Waiting time, cannot be shortened Inspection point with report

What we work on.

Seven projects we take on regularly. For each: the model that usually fits, the trades involved, and what is designed and checked beforehand.

ProjectModelTradesDesign and records
Loft conversionTurnkey contractorRoof, dormers, drywall, screed, windows, building servicesBuilding application, structural analysis and load transfer, second escape route, fire safety in the stairwell, sound insulation to the floor below
Core and full refurbishmentGeneral contractorAll trades in the order they are builtSchedule with drying times, pressure test with report, readiness for finishes by CM test, acceptance per unit
Riser replacement in an occupied buildingGeneral contractorPlumbing, heating, electrics, drywall, tilingPressure test to DIN EN 806-4, fire stopping at penetrations, photos of all pipes before closing up
Layout change with wall openingTurnkey contractorStrip-out, temporary support, steel beam, drywall, screed, paintingStructural calculation, support to the structural design, photos of the bearings before plastering
Facade and building envelopeGeneral contractorScaffolding, render and stucco, windows, roof, insulationScaffolding as a separate item, insulation under GEG, funding application before the order
Tenant fit-out for offices and practicesGeneral contractorDrywall, electrics and data, flooring, plumbing, paintingIn sections during operation, fire safety and workplace rules agreed before the offer
Basement and underground drainsGeneral contractorCCTV survey, underground drains, lifting station, waterproofingBackflow protection to DIN 1986-100, waterproofing and damp-proof course as found

Every trade in detail.

25 services in four phases, from the underground drain to the ridge, in the order they arise on site. Each comes with a detail drawing.

Refurbishment8 services
Building envelope5 services
Fit-out6 services
Building services6 services
DielungDeckenputzBalkenkopf im AuflagerDetail 01Period-building refurbishmentSection
Detail 01, Period-building refurbishmentBeam end in the bearing

Records, not promises.

Every registration can be checked with the body that keeps it. Insurance and bond certificates are available on request.

Charlottenburg Local Court
HRB 288078 B
Commercial register. Legal form, representation, contract partner for all services.
Berlin Chamber of Crafts
150205
Company number in the register of crafts: plumbing and heating, pipe and sewer technology. Registered specialist and master craftsman business.
Berliner Wasserbetriebe
Drinking water
Register of installers. Authorised to work on drinking water installations.
VDRK e. V.
Pipes and sewers
Association of pipe and sewer technology companies.

Records from design and construction.

What our architects and engineers calculate and our site managers check, you receive as a document. Every report is kept with the project in CLIENI Connect.

  • Structure and fire safety

    Structural calculation and fire safety concept from our design team, independent checking where required.

    before the work
  • Sound and thermal insulation

    Sound insulation under DIN 4109, GEG compliance for changes to the envelope and building services.

    with the design
  • Pressure and tightness tests

    Pressure test under DIN EN 806-4 for drinking water, tightness test under DIN 1986-30 for drainage, each with a report.

    before closing up
  • Waterproofing and screed

    Photo record of the waterproofing under DIN 18534, CM moisture test of the screed before flooring.

    before flooring

Same method, different form.

A developer needs a different offer from an owners' association, an embassy different records from a practice fitting out. Site management, schedule and acceptance stay the same.

Project developers

  • Award to your bill of quantities, unit prices or lump-sum fixed price.
  • Schedule with interfaces before work starts, acceptance per unit with a report.
  • Retention and bond under VOB/B, interim payments after verified measurement.
More for Project developers

Tell us what is coming up.

With plans or a bill of quantities: the route for tenders. Without documents: the route for owners.

Hours
Monday to Saturday, 8 am to 8 pm
Office
Kolonnenstraße 8, 10827 Berlin
Branch
Teltower Damm 283, 14167 Berlin
Languages
Support and reporting in German and English
Instagram
@clieni.de
Documents
Company presentation PDF in German, A4 landscape, 14 sheets, 0,5 MB

Vergabe

Für Projektentwickler, Verwaltungen, Bestandshalter und Architekten. LV, Pläne oder Objektliste bitte an hallo@clieni.de.